Cougar 3090 Zone Reservoir
Las Vegas, Nevada
$30M
Owner: Las Vegas Valley Water District
GC/CM: MMC
This project with the Las Vegas Valley Water District consists of the construction of two 5 MG buried concrete reservoirs. Also included are appurtenant piping, a disinfection and control building, and a tubular steel security fence.